Welcome to GT

Integrated Water Service

Integrated Water Service

Solution Overview:

With the rapid development of China's economy and science and technology, the construction of engineering has not only been limited to the land, but the construction of water geological exploration is becoming more and more important, and the traditional water geological exploration is mainly water geological drilling. It has complex work, high cost and long period of time, and drilling has the shortage of "point to surface", especially in the information opaque area, which may cause destruction to other buildings under water.

In view of this, under the guidance of the expert team of China University of Geosciences (Wuhan), our company has developed a high-density electrical prospecting system for water bodies. This system is based on the unique arrangement of electrode distance, and based on the rigorous and practical exploration operation process, by measuring the electrical parameters (resistivity, polarizability, frequency dispersion rate, etc.) of the underwater rock, the characteristics of the geological structure of the water bottom are analyzed and deduced, so as to provide a strong barrier for the construction of water engineering.

Compared with the traditional water geological drilling, the system has the characteristics of low cost, simple operation, short construction period and no damage, and has broad application prospects in the water exploration field.

System Composition:

The system is mainly composed of main control unit, transmitter, rechargeable power supply, underwater towed cable, underwater electrode and so on. The schematic diagram is as follows:


1526346319770268.png

Engineering Case:

1. Investigation of underwater geological structure in Nenjiang


1526346594116400.png

1526346650418225.png

1526346672691821.png

2. Investigation of sunken ships and metal objects at the bottom of Bohai

1526346817469003.png

1526346963135261.png

1526347000102376.png